North Elevation: Taking a picture of the northeast corner. The east side is the main entry side. You can see the entry vestibule (the part that sticks out).
Taking a picture of the west elevation. Plaster will be going above the brick. Personally, I like the color of the brick.
This is the south side of the building. This side is the side that faces Highway 121. This side will have the pool.
Taking a picture from the southwest.
That's the exterior of the building. I'll try to remember to put up some interior shots later on.
No comments:
Post a Comment