Not much to talk about, so I thought I would throw up some jobsite photos.
North Elevation:

Taking a picture of the northeast corner. The east side is the main entry side. You can see the entry vestibule (the part that sticks out).

Taking a picture of the west elevation. Plaster will be going above the brick. Personally, I like the color of the brick.

This is the south side of the building. This side is the side that faces Highway 121. This side will have the pool.

Taking a picture from the southwest.
That's the exterior of the building. I'll try to remember to put up some interior shots later on.
No comments:
Post a Comment